Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a bridge / tunnel in Windsor, Ontario. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
Design, build, finance, operate and maintain the Gordie Howe International Bridge Project. The Gordie Howe International Bridge is slated to become a six-lane crossing over the Detroit River between southwest Detroit and Windsor. Structure will be located at end of Hwy 401, Windsor Ontario to 1-75 Detroit Michigan. Bridging North America consortium group has been selected as the preferred proponent. Consortium proponents are as follows: ACS Infrastructure Canada , AECOM, Richmond Hill, Carlos Fernandez Casado and FHECOR Ingenieros Consultores, SA Based in Spain, DBI Services LLC, Dragados Canada, Fluor Canada Ltd, Moriyama and Teshima, RBC Dominion Securities, Smith Miller Hawkinson Architects, Turner Construction Company and Aecon Group Inc. TIMELINE: Sub trade information is unreleased for publication. Construction has commenced; completion is now targeted for completion and open to traffic by late 2024. Estimates on the project's total value have ranged from $2.1 billion to $4 billion. *Project has been updated to ONLY SHOW A NEW COMPLETION TIMELINE.
Under Construction
Bridges / Tunnels
$4,000,000,000.00
Public - Federal
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
June 5, 2018
October 1, 2018
September 30, 2025
end of Hwy 401, Windsor Ontario, Windsor, ON
Related To This Project
Windsor, ON
--
Windsor, ON
Bid Date: Mar 09 2023
Windsor, ON
Bid Date: Apr 04 2023
Windsor, ON
Bid Date: Mar 21 2023
Windsor, ON
Bid Date: Feb 28 2023
Windsor, ON
Bid Date: Mar 21 2023
Windsor, ON
Bid Date: Feb 28 2023
Windsor, ON
Bid Date: Feb 22 2023
Windsor, ON
Bid Date: Feb 22 2023
Windsor, ON
Bid Date: Mar 03 2023
Windsor, ON
Bid Date: Mar 09 2023
Windsor, ON
Bid Date: Feb 13 2023
Windsor, ON
Bid Date: Feb 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--