Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Roselle, Illinois. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of April 14, 2020, an engineering firm has been selected to complete design work. Information regarding contractor selection has not been disclosed. A firm timeline for bidding and construction has not been announced. Under the continued leadership of DuPage and Cook Counties, the project team anticipates that by 2025 it will be able to secure additional grant funding or in-kind contributions needed for design and construction. *The following solicitation has been preserved for historical reference: Elgin O’Hare Western Access, Pratt Boulevard to Touhy Avenue This project has a 24% D/M/WBE participation goal and 2% VOS/SDVOSBE participation goal. Phase II engineering services are required for the preparation of contract plans and specifications for the proposed improvements including, but not limited to, construction of new mainline lanes for the Elgin O’Hare Western Access between I-294 and I-90. This project is approximately located along the Western Access between Pratt Boulevard and Touhy Avenue and includes the proposed Western Access at Touhy Avenue interchange ramps. The Tollway is finalizing design and construction limits; therefore the Tollway may modify project limits and scope at the time of negotiations. Name:Greg Stukel Address: 2700 Ogden Avenue Downers Grove IL 60515 Phone:630-241-6800 Fax: 630-241-6105 E-Mail Address:gstukel@getipass.com The work generally encompasses roadway design and shall include but not be limited to the following: Design of mainline pavement. Design of retaining walls New drainage structures and modification of existing drainage system. Provide erosion controlfor all construction zones. Provide design of appropriate landscape and soil erosion/sedimentation control measures as necessary in accordance with the Tollway's EnvironmentalStudies manual. Provide pavement markings, delineators and signage for the contract limits. Provide barrier warrant analysis for all necessary locations and installation of guardrail,anchors and terminals to conform to the current AASHTO Guidelines and lllinois Tollway criteria. Update roadway lighting as required. 9. Provide maintenance ol traffic plans including those for impacts to local facilities. 10. Protection and / or relocation of utilities. 11. All other appurtenant and miscellaneous items. Construction estimate: Category C Firms must be prequalified by IDOT in the following categories: Highways (Freeway) Key personnel listed on Exhibit A for this project must include: o The person who will assume the duties of the Project Manager for all aspects of the work documents (must be an lllinois Licensed Professional Engineer). o The person who will perform the duties of the Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an lllinois Licensed Professional Engineer). o The person who will be responsible for roadway design related issues (must be an lllinois Licensed Professional Engineer). o The person(s) who will perform the QC/QA review work of all milestone submittals, who must be an lllinois Licensed Professional Engineer lor roadway elements and an lllinois Licensed Structural Engineer for structural elements. The Consultant must have MicroStation capabilities. All final documents shall be submitted in hard,copy and electronic format and follow the CADD STANDARDS Manual. This project will be managed through the Tollway's web-based project management system. The Consultant will be required to participate in these procedures and will reCeive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultanfs Program (COP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a briefing at the Tollway Central Administration office building in Downers Grove. The method of contractor selection has not been determined at this time
Design
Roads / Highways
$40,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2025
Multiple Locations, Roselle, IL
Related To This Project
Roselle, IL
Bid Date: Jan 13 2022
Roselle, IL
Bid Date: Feb 16 2022
Roselle, IL
Bid Date: Feb 16 2022
Roselle, IL
Bid Date: Mar 15 2024
Roselle, IL
Bid Date: Aug 16 2023
Roselle, IL
Bid Date: Aug 16 2023
Roselle, IL
Bid Date: Jan 28 2022
Roselle, IL
Bid Date: Mar 09 2022
Roselle, IL
Bid Date: Mar 30 2023
Roselle, IL
Bid Date: Mar 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.