BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Roselle, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Rodenburg Road (from Central Avenue north to the railroad tracks): Staff was successful working with the Village of Schaumburg in having Rodenburg Road between Central Avenue and Irving Park Road reclassified as an STP route. Reclassification makes Rodenburg Road, north of Central Avenue, eligible for STP funding. The Rodenburg Road section in Schaumburg is under the Northwest Municipal Conference (NWMC) for funding. However, both NWMC and DMMC follow similar requirements and it is more desirable to join projects for continuity. The Village entered into a cost sharing agreement with the Village of Schaumburg to conduct a Phase 1 preliminary engineering study. The purpose of the study was to better define the scope (pavement width, bike path, drainage requirements), railroad crossing implications (quiet zone), environmental impacts (wetlands), federal funding opportunities and estimated costs. In early 2020 both Roselle and Schaumburg applied for and were awarded STP funds for the reconstruction of Rodenburg Road in both communities. In 2022, Phase 2 Design Engineering will be completed as a joint effort with Schaumburg and wetland mitigation will begin. As of February 9, 2022, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,360,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
93
Bidding Soon
1,929
All Active Projects
835
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

Rodenburg Rd, Roselle, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.