BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Tucson, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for outdoor lighting for a road / highway; and water / sewer project.

Tracs no 010 PN 248 H7583 01C Project no 010-D(211)S Termini CASA GRANDE - TUCSON HWY (I-10) Location INA ROAD TO RUTHRAUFF RD Tracs no 0000 PM PPM T0327 01C Project no PPM-0(268)D Termini PIMA COUNTY Location SANTA CRUZ RIVER TO RIVER RD ROUTE NO. MILEPOST DISTRICT ITEM NO. 010 248.03 to 251.85 SOUTHCENTRAL 8915 N/A N/A SOUTHCENTRAL 101482 The amount programmed for this contract is $200,000,000. The location and description of the proposed work are as follows: The proposed work for project 010 PM 248 H7583 01C is located in Pima County, on 1-10 from milepost 248.03 to milepost 251.85, in the City of Tucson, Town of Marana, and unincorporated Pima County. The work consists of reconstructing 1-10 to provide four general purpose lanes in each direction. The work includes construction of bridges, Portland cement concrete pavement, asphaltic concrete pavement, drainage facilities, and mechanically stabilized earth walls. Additional work includes, pavement markings, signing, lighting, freeway management system, landscaping, aesthetics, and other related work. The proposed work for project 0000 PM PPM T0327 01C is located in the City of Tucson and unincorporated Pima County along Sunset Road, starting at the Santa Cruz River Bridge just east of Silverbell Road, and extending east to River Road. The work consists of roadway and bridge improvements including pathway connection to the Chuck Huckelberry Loop for approximately 1.06 miles of roadway construction. The work also includes construction of bridges, Portland cement concrete pavement, asphaltic concrete pavement, drainage facilities, and mechanically stabilized earth walls. Additional work includes pavement markings, signing, lighting, freeway management system, landscaping, aesthetics, and other related work. The time allowed for the completion of the work included in the Construction Phase of the contract will be 1010 calendar days. The time allowed for the completion of the work included in the Landscape Establishment Phase of the contract will be 730 calendar days. The Arizona Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be7.87 All labor employed on this project shall be paid in accordance with the minimum wage rates shown in the General Wage Decision. These rates have been determined in accordance with the requirements of the law and issued by the Secretary of Labor for this project. The wage scale is on file in Contracts and Specifications Section and copies may be obtained at all reasonable times. This contract is subject to the provisions of Arizona Revised Statutes Section 42-5075 -- Prime contracting classification; exemptions; definitions. A Proposal Guaranty in the Form of Either a Certified or a Cashier's Check Made Payable to the State Treasurer of Arizona for Not Less Than 10 Percent of the Amount of the Bid or in the Form of a Surety (Bid) Bond for 10 Percent of the Amount of the Bid Shall Accompany the Proposal. Surety (Bid) Bonds Will Be Accepted Only on the Form Provided by the Department and Only From Corporate Sureties Authorized to Do Business in Arizona. Questions can be submitted through the Questions and Answers link located within the corresponding letting date and project proposal number links AZDOT - Casa Grande - Tucson Highway (I-10) (Ina Road to Ruthrauff Road)

Bid Results

Roads / Highways

$170,988,897.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

2212

12

47

15

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
173
All Active Projects
60
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2022

February 20, 2023

img_map_placeholder

I-10, Tucson, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.