BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 21, 2022 at 7:00 PM

Updated September 15, 2023

Site work, paving and outdoor lighting for a mixed-use development in Jacksonville, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Clay, Dist/st-wide, Duval Road Name: I-295 (Sr 9a) Limits: At Us 17 to S of Wells Rd to N of Collins Rd and From Buckman Br to Us 17 Project(s): 43557515201(*) Federal Aid No: D221018B Project(s): 44604415201 Federal Aid No: D221092B Total Roadway Length: 3.605 Miles Contract Days: 600 Total Bridge Length: 0.046 Miles Total Proposal Length: 3.651 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days JEA Standards. Table A -- Schedule of Values is required to be submitted with the bid, as per Technical Special Provision T1000-9. Please upload completed Table A as a zip file within your EBSx File using the "File Attachment Upload" tab before submitting your bid. The improvements under this contract consist of milling and resurfacing, reconstruction, base work, shoulder treatment, drainage improvements, curb and gutters, traffic signals, lighting, highway signing, guardrail, sidewalks, gravity wall, concrete slope pavement, ITS and other incidental construction on I-295 (SR 9A) at US 17 to south of Wells Road in Duval/Clay Counties (435575-1-52-01) and I-295 (SR 9A) from Buckman Bridge to US 17 in Duval County (446044-1-52-01) For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Interchange - Add Lanes/Milling and Resurfacing/Drainage Improvements/Clearing and Grubbing

Award

Roads / Highways

$30,467,542.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
36
Bidding Soon
1,071
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

October 17, 2022

Project location map

I-295, Jacksonville, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.