BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Ottawa, Ontario. Conceptual plans call for the renovation of a municipal facility.

Major repairs to the Supreme Court of Canada Building (SCCB) will include fully restoring its structure while preserving its heritage. The project includes: Asbestos removal; major rehabilitation of heritage fabric, including exterior walls, windows and interior finishes; major rehabilitation of mechanical, electrical and life safety systems; modernization of information technology, multimedia and security systems; seismic upgrading to current building code requirements; interior fit-up for Supreme Court of Canada Building occupants. TIMELINE: The owner issued a request for Request for Qualification (EH900-201608/B) in 2020. Contract was not awarded. Owner is presently evaluating the project to ensure it represents the best value for money. Construction is not expected to take place until completion of the West Memorial Building in 2024. A number of preliminary and feasibility studies have been completed on the SCCB, including most recently a 2022 design exercise to identify the end user requirements for the eventual main rehabilitation project. Process EH900-201608/B (information (covered in the report under ID name: RFQ Construction Manager - Renovation of the Supreme Court of Canada Building) was a Request for Qualification to identify qualified respondents that would be invited to participate in the eventual Request for Proposal (RFP) for construction management services. The process concluded in May 2021 with three Canadian firms identified. However, the tender and award of the construction manager RFP has not yet taken place. Timelines for design and construction have not been established yet. Further update in winter, 2024/2025. *A budget of over $1 billion has been identified for the entire project. This overall budget is not limited to the rehabilitation of the Supreme Court of Canada Building, but includes the rehabilitation of the West Memorial Building which is currently under construction and followed under a separate report called West Memorial Heritage Building Rehabilitation.

Conceptual

Municipal

$500,000,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
33
Bidding Soon
604
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.