Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2021 at 8:00 PM

Updated May 20, 2026

Site work for a power facility in Fort St. John, British Columbia. Completed plans call for site work for a power facility.

This RFP is for the construction of two new 75 kilometer, 500 kV transmission lines to connect the Site C South Bank substation to the 500 kV transmission system at the Peace Canyon generating station, and the modification of the existing 138 kV transmission system, including removal of two 138 kV transmission lines, to supply Fort St John substation and Taylor substation from the Site C South Bank substation.

Award

Power Plant

$119,070,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

100 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
0
Bidding Soon
51
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2017

May 21, 2018

Project location map

Site C Substation to the existing Peace Canyon Generating Station, Fort St. John, BC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed