Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 5, 2020 at 8:00 PM
Updated November 15, 2023
Site work and paving for a mixed-use development in Clearwater, Florida. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Counties: Pinellas Road Name: SR 693/ SR 688 - Resurfacing Limits: 15061000 Project(s): 44024515201(*) Federal Aid No: N/A Total Roadway Length: 1.391 Miles Contract Days: 90 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.391 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Acquis. Days The Improvements under this Contract consist of milling, resurfacing, updating signing and pavement markings, and bringing pedestrian features into conformance with current ADA standards on SR 693/66th Street North from south of SR 688/Ulmerton Road to south of 138th Avenue North and SR 688/Ulmerton Rd from west of Forest Lake Dr to west of SR 55/US 19 in Pinellas County. Prequalification Required. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Hot Plant-Mixed Bituminous Courses - SR 693/ SR 688
Award
Roads / Highways
$1,873,216.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2020
April 17, 2020
Multiple Locations, Clearwater, FL
Related To This Project
Clearwater, FL
Bid Date: Feb 18 2022
Clearwater, FL
Bid Date: Feb 17 2022
Clearwater, FL
Bid Date: Dec 15 2021
Clearwater, FL
Bid Date: Feb 15 2022
Clearwater, FL
Bid Date: Feb 10 2022
Clearwater, FL
Bid Date: Feb 24 2022
Clearwater, FL
--
Clearwater, FL
Bid Date: Aug 31 2021
Clearwater, FL
--
Clearwater, FL
Bid Date: Jan 25 2022
Clearwater, FL
Bid Date: Jan 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
