BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in West Palm Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; for outdoor lighting for a road / highway; bridge / tunnel; and water / sewer project.

Construction is anticipated to commence 10-26-2023. Counties: Palm Beach Road Name: SR 710 (Beeline Hwy) and Sr 91 Limits: From W of Cr 809a to E of Sr 708 Project(s): 41925115201(*) Federal Aid No: D421077B Project(s): 41925115202 Federal Aid No: N/A Project(s): 41925115203 Federal Aid No: N/A Total Roadway Length: 3.142 Miles Contract Days: 1726 Total Bridge Length: 0.000 Miles Total Proposal Length: 3.142 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Calendar Days For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. The improvements under this contract consist of, but are not limited to, roadway reconstruction, widening, Bridge No. 931015 replacement (removal, superstructure including traffic railing, substructure including drilled shaft), bulkhead, retaining wall, sheet piling, fencing, monitor existing structures (inspection, settlement, vibration), MOT (standard, special detour, barrier, separator, crash cushion, officer), protection (sediment, turbidity, inlet), asphalt (milling, base, superpave, friction, miscellaneous), earthwork (excavation, embankment), concrete (removal, gravity wall, culvert, endwall, shoulder barrier, median barrier, sidewalk, driveways, separator, ditch pavement, opaque barrier, prestressed pole, filling/plugging), steel (reinforcing), riprap (rubble), bedding stone, guardrail (removal, general, special post, transition, end treatment), pipe rail, drainage (inlets, manholes, junction box, pipe culvert, valley gutter, curb, curb and gutter, shoulder gutter), pavement markings (detectable, raised, painted, thermoplastic, permanent tape, bike lane), signing (single-post, multi-post, panel, object marker, panel, internally-illuminated), lighting (conduit, pull/splice box, junction box, power service, pole complete, cable distribution), signalization (conduit, signal cable, fiber optic, multiconductor, pull/splice box, power service, service wire, aluminum pole, steel mast arm, vehicular signal and loop detection, pedestrian signal and detection, controller, field ethernet, wireless communication), ITS (documentation, location, conduit, fiber optic, pull/splice box, power service, service wire, service disconnect, transformer, service pole, CCTV pole and camera, microwave detection, cabinet, field ethernet, server, UPS, remote management), utilities (adjustments, fire hydrant relocation), along SR 710 (Beeline Hwy.). C For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 Add Lanes and Reconstruct/Bridge Replacement/Milling and Resurfacing/Drainage Improvements

Award

Roads / Highways

$148,287,604.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

155 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
48
Bidding Soon
1,116
All Active Projects
499
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

October 26, 2023

img_map_placeholder

Bee Line Hwy, West Palm Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.