Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in West Palm Beach, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Counties: Palm Beach Road Name: SR-809/military Trail at Forest Hill Blvd Limits: 93016000 Project(S): 43787815201(*) Federal Aid No: N/a Project(S): 43787815601 Federal Aid No: N/a Project(S): 43787815602 Federal Aid No: N/a Total Roadway Length: 3.180 Miles Contract Days: 748 Total Bridge Length: 0.000 Miles Total Proposal Length: 3.180 Miles Contract Execution Days: 10 Special Start Date: 09/06/22 Aquis/flexible Start Time: 15 The Improvements under this Contract consist of, but are not limited to, maintenance of traffic (standard, temporary barrier, temporary crash cushion, temporary signalization and maintenance, temporary traffic detection and maintenance), environmental (sediment barrier, turbidity barrier, inlet protection), litter and mowing, monitor existing structures (inspection, settlement, vibration), earthwork (excavation, embankment), concrete (curb, gutter, sidewalk, driveways), asphalt (base, milling, superpave, friction course), drainage (inlets, manholes, pipe culvert), signing (single-post, object marker, delineator, panel internally illuminated), pavement markings (detectable, raised,painted, thermoplastic, bike lane), conduit, pull/splice box, ITSFM documentation (subsurface, location), signalization (signal cable, fiber optic cable, communication cable, concrete service pole, aluminum signals pole, pole removal, steel mast arm, vehicular signal, pedestrian signal, pedestrian detector, loop assembly, controller), ITS (cabinet removal, cabinet F&I, CCVT, ethernet), electrical (power service F&I, power service remove, service wire, service disconnect), traffic monitoring (vehicle sensor, inductive loop, cabinet) lighting (luminaire with bracket), utilities (manhole adjustment, valve box adjustment, pipe removal, pipe F&I, fittings, fixtures, fire hydrant F&I, fire hydrant removal), and sod along State Road 809 (Military Trail) at State Road 882 (Forest Hill Boulevard) for 0.705 miles in the Village of Palm Springs and the City of Greenacres, Palm Beach County Contractor needs to be pre-qualified. A Contract / Performance bond is required for this project. Begin work on this Contract on September 06, 2022. Perform no work on this Contract prior to the date identified herein, unless otherwise authorized in writing by the Engineer. The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a $5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess policy. The limits of coverage described herein shall apply fully to the work or operations performed under the Contract and may not be shared with or diminished by claims unrelated to the contract. The policy/ies and coverage described herein may be subject to a deductible. Pay all deductibles as required by the policy. No policy/ies or coverage described herein may contain or be subject to a Retention or a Self-Insured Retention
Award
Roads / Highways
$6,850,982.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2022
September 6, 2022
FL-809 & S Military Trail, West Palm Beach, FL
Related To This Project
West Palm Beach, FL
Bid Date: Nov 09 2023
West Palm Beach, FL
Bid Date: Dec 15 2022
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Dec 21 2022
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Jun 14 2022
West Palm Beach, FL
Bid Date: Jun 17 2022
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Jun 13 2022
West Palm Beach, FL
Bid Date: May 17 2022
West Palm Beach, FL
Bid Date: Jun 10 2022
West Palm Beach, FL
Bid Date: May 03 2022
West Palm Beach, FL
Bid Date: Jun 09 2022
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Jan 17 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.