BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a multi-residential development in West Palm Beach, Florida. Completed plans call for site work for a multi-residential development.

The City of West Palm Beach is accepting bids from qualified and responsible Contractors to furnish and assume full responsibility for all labor, material, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit to perform the demolition of existing structures and construction of the Northwood Hills Neighborhood Improvements as shown in the construction plans and described in the technical specifications for the project. Final Questions Due: May 12, 2022 at 3:00p.m. Please email questions to mwatson@wpb.org or call 561-822-2031 for assistance. ITB NO. 21-22-118 6 SCOPE OF WORK Contractor shall furnish and assume full responsibility for all labor (including costs for overtime, nights, weekends, holiday and multiple phasing work), materials, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit and other incidentals necessary to perform the Work, as shown on the construction plans titled "Northwood Hills Neighborhood Improvements" dated December 2021 and associated technical specifications. The Project overview is as follows: Project Location & Background: The City of West Palm Beach (City) has received a grant from the Florida Department of Transportation (FDOT) through the Local Agency Program (LAP) to develop, design and construct American Disability Act (ADA) improvements, sidewalks, crosswalks and mill and resurface the roads throughout the North Section of the Northwood Hills Neighborhood, under a separate project (Northmore Elementary Sidewalks Project). Pursuant to the terms of the grant, the Northmore Elementary Sidewalks Project must start construction in October 2022 and be completed no later December 2023.

Post-Bid

Multi-Residential

$200,000.00

Public - City

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
52
Bidding Soon
1,943
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

October 20, 2022

Project location map

401 Clematis St, West Palm Beach, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.