BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2019 at 7:00 PM

Updated June 19, 2025

Paving and renovation of a civil project in Yellowstone National Park, Wyoming. Completed plans call civil work for a bridge / tunnel, road / highway and water / sewer project.

*Contract Award Date: March 29, 2018 Contract Award Number: 69056718F000052 Contract Award Dollar Amount: $41,743,079.70 Contractor Awarded Name: OFTEDAL Construction, Inc. Contractor Awarded DUNS: 006245658 Contractor Awarded Address: PO Box 400 Miles City, Montana 59301 United States This project consists of grading, drainage, select borrow, base and paving. East Entrance Road reconstruction between the Grand Loop Road and 3.7 miles toward the east. Reconstruction of parking areas and construction of a new parking area within Fishing Bridge Village. Work consists of roadway excavation, select borrow, grading, drainage, base, paving, pavement obliteration, and stone masonry curbing. and other small items of work. See "Description of Work" for additional details Length: 3.7 Miles. (Obtain this info from the FBO sheet you received from Design.) Tentative Completion Date Fall 2019 and 2021 Estimated Price Range: Over $20,000,000 This is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Plans and specifications are not available at this time. Responses to this Sources Sought must be received by email or fax no later than the date specified in the response section. This intent of this sources sought is for solicitation refinement and market research on qualified bridge subcontractors with sufficient capability to perform all or a portion of the requirements below.. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition. Requirement: The proposed contract action is for a firm-fixed-priced task order construction contract ordered from our Yellowstone & Grand Teton National Park MATOC. The project contains two major bridge portions: Pelican Creek Bridge replacement: 1,483 foot, 9 span weathering steel girder superstructure with cast in place concrete deck, deep foundation (open ended steel pipe piles), structural steel fabrication/erection, structural concrete, reinforcing steel, bridge rail. The work includes the removal of the Existing Bridge and road embankment material of the causeway. Fishing Bridge Rehabilitation: removal of asphalt wearing surface, install Fiber Reinforced Polymer (FRP) bridge deck panels, excavate and backfill west approach with Geosynthetic Reinforced Soil (GRS), repair abutment, and install FRP jackets on timber piles. NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $36.5 million. Estimated Price Range: More than $20 million. Response: Responses to this notice shall include the following: (a) Company Name (b) Address (c) Point of contact (d) Phone, fax, and email (e) DUNS number (f) Type of business, e.g. Large Business, Small Business, Services Disabled Veteran Owned Small Business, , 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, or Small Business HUBZone business: (h) Listing of your bridge construction experience within the last 6 years where you were the prime or subcontractor for work of similar type and scope. Include contract numbers, titles, locations, dollar amounts. In addition, answer the five questions below: Within the past 5 years, have you successfully completed 1 cast-in- place concrete deck with 5 or more individual concrete pours . Within the past 5 years, have you successfully completed 1 or more projects where driving of steel pipe piles was greater than or equal to 30" diameter, a minimum of 60' in length, and with at least one splice Within the past 6 years, have you successfully installed and worked from a work bridge over wetlands/rivers or other environmentally sensitive areas Within the past 6 years, have you successfully completed 1 vehicular bridge 750' or longer with span lengths greater than 150' and the superstructure consisted of steel girders with a cast in place deck Within the past 6 years, have you successfully completed 1 bridge construction project with 250 CY of concrete, where the concrete supply was 60 miles or more from the concrete batch location or where a running mobile concrete batch plant was at the project site The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. Contracting Office Address: 610 East Fifth Street Vancouver, Washington 98661-3801 Place of Performance: Yellowstone National Park Wyoming United States Primary Point of Contact.: Contracts G. Office, Western Federal Lands Highway Division WFL.Contracts@dot.gov Phone: (360)619-7520 Fax: (360)619-7932

Under Construction

Bridges / Tunnels

$41,743,079.00

Public - Federal

Paving, Renovation

1078

1

43

8

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
8
Bidding Soon
68
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2018

April 16, 2018

Project location map

E Entrance Rd, Yellowstone National Park, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.