Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Gilbert, Arizona. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of June 21, 2022, a timeline for construction has not been established. No further inquiries to be accepted. Construction work, in general, consists of reconstruction of the bridge deck on Val Vista Drive and the Eastern Canal and the installation of a HAWK crossing; and other incidental work. The Engineer's estimate is $1,695,000.00 Each bid shall be in accordance with the Contract Documents. Any bid which does not conform in all material respects to the Contract Documents will be considered non-responsive. Each bid shall be submitted on the bid form(s) included in the Contract Documents; shall be accompanied by a certified or cashier's check or bid bond for ten percent (10%) of the amount of the bid, made payable to the order of the Town of Gilbert and shall be included in the bid as a guarantee that the successful Bidder will enter into a contract to perform the work in accordance with the Contract Documents Right to Reject Bids: GILBERT reserves the right to reject any or all bids, waive any informality in a bid or to withhold the award for any reason GILBERT determines. Equal Opportunity: GILBERT is an equal opportunity employer. Minority and women's business enterprises are encouraged to submit bids on this Project. STR NO. 9450 The Work shall be substantially complete within eighty (80) working days after the date when the Contract Times commence to run as provided in the Notice to Proceed, and all Work shall be finally completed and ready for final payment in accordance with the Notice to Proceed within one hundred (100) working days after the date when the Contract Times commences to run. The successful BIDDER, simultaneously with the execution of the CONTRACT, will be required to furnish a PAYMENT BOND in an amount equal to one hundred percent (100%) of the CONTRACT SUM and a PERFORMANCE BOND in an amount equal to one hundred percent (100%) of the CONTRACT SUM. *This project has been awarded and all trades have been let.
Award
Bridges / Tunnels
$2,890,425.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2021
July 25, 2022
S Val Vista Dr, Gilbert, AZ
Related To This Project
Gilbert, AZ
Bid Date: Jan 27 2020
Gilbert, AZ
Bid Date: May 27 2021
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Jun 28 2022
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Feb 17 2022
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Jun 03 2021
Gilbert, AZ
Bid Date: Jun 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.