BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Gilbert, Arizona. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of June 21, 2022, a timeline for construction has not been established. No further inquiries to be accepted. Construction work, in general, consists of reconstruction of the bridge deck on Val Vista Drive and the Eastern Canal and the installation of a HAWK crossing; and other incidental work. The Engineer's estimate is $1,695,000.00 Each bid shall be in accordance with the Contract Documents. Any bid which does not conform in all material respects to the Contract Documents will be considered non-responsive. Each bid shall be submitted on the bid form(s) included in the Contract Documents; shall be accompanied by a certified or cashier's check or bid bond for ten percent (10%) of the amount of the bid, made payable to the order of the Town of Gilbert and shall be included in the bid as a guarantee that the successful Bidder will enter into a contract to perform the work in accordance with the Contract Documents Right to Reject Bids: GILBERT reserves the right to reject any or all bids, waive any informality in a bid or to withhold the award for any reason GILBERT determines. Equal Opportunity: GILBERT is an equal opportunity employer. Minority and women's business enterprises are encouraged to submit bids on this Project. STR NO. 9450 The Work shall be substantially complete within eighty (80) working days after the date when the Contract Times commence to run as provided in the Notice to Proceed, and all Work shall be finally completed and ready for final payment in accordance with the Notice to Proceed within one hundred (100) working days after the date when the Contract Times commences to run. The successful BIDDER, simultaneously with the execution of the CONTRACT, will be required to furnish a PAYMENT BOND in an amount equal to one hundred percent (100%) of the CONTRACT SUM and a PERFORMANCE BOND in an amount equal to one hundred percent (100%) of the CONTRACT SUM. *This project has been awarded and all trades have been let.

Award

Bridges / Tunnels

$2,890,425.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
14
Bidding Soon
716
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.