BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work and addition to a fire / police facility in Gilbert, Arizona. Completed plans call for the addition of a fire / police facility.

As pf April 20, 2022, a construction manager at risk, architect, and project/construction management firm has been selected for the project. Construction is estimated for February of 2022. *The closed solicitation has been included below for reference: This will be a Construction Manager at Risk Project pursuant to ARS Section 34-601 et seq. Design and construction to expand the existing dispatch center on the second floor of the Police Department Building. Design and Construction to reconfigure the existing Counseling space, in the police department building, for displaced second floor Police Department staff. Design and construction of vacant space in the existing Court building for Counseling and Police Department staff. The project scope will include the design and construction to expand the existing dispatch center located at the Public Safety Complex at 75 E. Civic Center Drive, Gilbert, AZ 85296. The dispatch center currently occupies approximately 4,400 sf on the second floor of the building. The current space includes (15) fifteen public safety dispatch consoles (three of which were recently added). The expansion will need to accommodate (5) five additional dispatch stations, (4) four additional spaces for future growth and additional department support space. The space will be expanded to approximately a total of 10,000 sf. GILBERT is an equal opportunity employer. Minority and women's business enterprises are encouraged to submit on this Project. GILBERT reserves the right to waive any irregularities in any submittal and to reject all submittals and re-advertise or cancel the project in its entirety, at its sole discretion. GILBERT, or its consultants and advisors, will not be responsible for any cost incurred by any firm submitting a SOQ or responding to this notice. As of May 19, 2021, the method of contractor has yet to be selected. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. As a participating member of the Project Team, the CM@R will provide to GILBERT, within 20 Working Days of the Notice to Proceed The Initial Construction Schedule shall indicate the detailed plan for the work to be completed in the first ninety (90) calendar days of the Contract; details of planned mobilization of plant and equipment; sequence of early operations; and procurement of Materials and equipment. Work beyond ninety (90) calendar days shall be shown in summary form.

Award

Fire / Police

$8,063,000.00

Public - City

Addition, Demolition, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
58
Bidding Soon
1,291
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.