BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2022 at 7:00 PM

Updated November 14, 2023

Site work and paving for a mixed-use development in Chandler, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of 03/04/2022 This project has not been awarded. C.O.C. LOG NO. CIV18-0065 The Gilbert Road Improvement project is federally funded and consists of widening the roadway to include two through lanes in each direction from Gilbert Road to 148th Street. This project will complete the remaining unimproved roadway and includes turn lanes, bike lanes, raised medians, streetlights,4 traffic signals, fiber network, drainage, and utility improvements. Work must be completed within 270 consecutive calendar days from the Notice to Proceed. All solicitation questions must be emailed to Paula Brown at paula.brown@chandleraz.gov, no later than 5:00 p.m. local Arizona time on January 5, 2022. The Engineer's Estimate range is $ 4,000,000 - $ 5,000,000. This is a Federal Funded Project with DBE requirements. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bids must be submitted on the Proposal Form provided and be accompanied by the Bid Bond for not less than ten percent (10%) of the total bid, payable to the City of Chandler, Arizona, or a certified or cashier's check. The successful bidder must furnish a Payment Bond and Performance Bond in the amount equal to one hundred percent (100%) of the Contract Price. The right is hereby reserved to accept or reject any or all bids or parts thereto, to waive any informalities in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with the City of Chandler. All Bids will remain open for 90 days after the Bid opening day, but the CITY may, in its sole discretion, release any Bid and return the bid security prior to that date. No Bidder may withdraw his Bid during this period without written permission from the city. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Bid Results

Roads / Highways

$6,635,955.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
46
Bidding Soon
1,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2022

March 21, 2022

Project location map

E Ocotillo Rd, Chandler, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.