BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2022 at 8:00 PM

Updated December 7, 2024

Site work and paving for a civil project in Hawley, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; and water / sewer project.

For the rehabilitation and improvement of a certain section of STATE HIGHWAY, BRIDGES and Concrete Culverts in PIKE COUNTY, Palmyra and Blooming Grove TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 0084, SECTION 495. The project being situated as follows: West bound SR 0084, PIKE COUNTY- from SR 0390 approximately 2 miles West at Segment 0255 Offset 1800 (Station 864+00) WB to a point approximately 2 miles West from SR 0739 at Segment 0335 Offset 0795 (Station 1278+00) WB, for a length of 40,897 Feet (7.746 Miles). East bound SR 0084 PIKE COUNTY- from SR 0390 approximately 2 miles West at Segment 0254 Offset 1800 (Station 888+00) EB to a point approximately 2 miles West from SR 0739 at Segment 0334, Offset 0885 (Station 1301+00) EB, for a length of 40,252 Feet (7.737 Miles). Also, SR 8004 and SR 8006 For the reconstruction of an existing 24 foot rural interstate roadway, east bound and west bound, consisting of excavation, superpave wearing course 1 1/2 " and 2" depth, superpave binder course 2 1/2 " - 3 1/2 " depth, superpave base course 6" - 8" depth and subbase 6" and 8" depth, drainage, guiderail, fencing, temporary concrete barrier, concrete curb, landscaping, E & S control measures, temporary traffic control, temporary highway lighting/ poles, signing, delineators, pavement markings, Bridge/ Culvert removal, concrete repair work. Also, embankment work, Two (2) single span comp P/S bulb-tee beam Bridge Replacements, Two (2) 3-span comp P/S bulb-tee Bridge Replacements and Seven (7) Concrete Culvert Rehabs and other miscellaneous construction work all contained within an overall project length of 40,897 linear feet (7.746 miles) West bound and 40,252 linear feet (7.737 miles) East bound as indicated on the approved drawings included in the bid package. Project Cost Range: $100,000,000.00 - $124,999,999.99 Federal Project Status: Federal Oversight Structure Work: 11.00% Let Type: Scheduled Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Highway Reconstruction 408 Version: 2020-4 All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - I-84 E and W I-4R E26 to E3 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$108,527,067.00

Public - State/Provincial

Paving, Site Work

2323

14

135

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
657
Active Projects
309
Bidding Soon
5,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

July 25, 2022

Project location map

I-84, Hawley, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.