BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and new construction of a road / highway in Lincoln, Nebraska. Conceptual plans call for the construction of a road / highway.

The East Beltway project consists of a 4-lane roadway designed to freeway standards, similar an Interstate. The general alignment for the East Beltway runs from I-80 east of the Highway 6 interchange to Nebraska Highway 2 approximately along the 127th Street alignment. As of September 23, 2021, this project is in the conceptual phase. The project is pending funding for construction. An engineer has not been selected. A firm timeline for construction has not been established, but not likely to start prior to 2049.

Conceptual

Roads / Highways

$350,000,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
85
Bidding Soon
860
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2031

Project location map

Interstate 80, Lincoln, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.