BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Lions Head, Ontario. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; and road / highway.

Sealed bids marked "RFT 5440-21-02 Request for Tender for Construction of the Chippewas of Nawash First Nation Water Treatment Plant" will be received electronically by Associated Engineering (Ont.) Ltd. via MERX from pre-qualified contractors based on RTP 21-03 for the Chippewas of Nawash First Nation Water Treatment Plant. NOTE - only the following pre-qualfied general contractors will be permitted to submit a tender in response to this request: AECON Water Infrastructure; BGL Contractors Corp; H2Ontario Inc.; and Industra Construction. The work involves (but is not limited to) the following: - Construction of a new greenfield 14.2 L/s water treatment plant (WTP) including below ground reservoir and 300 m intake into Georgian Bay. The new WTP (footprint of 25 x 25 m) will consist of a series of cast-in-place concrete tanks below grade supporting a steel superstructure. The steel superstructure will accommodate the process equipment mainly on the main floor and will have a partial second floor housing office and mechanical rooms. - Incorporation of a packaged treatment system in the above new WTP. It should be noted that the Owner has entered into a formal pre-selection agreement with BI Pure Water Inc. for supply of a packaged treatment system. The Owner will novate the pre-selectoin agreement with BI Pure Water Inc. for the packaged treatment system supply to the General Construction Contractor. - Access to the new WTP site via construction of an extension of Wilmer's Road from the intersection of Wilmer's Road and Pit Road 600 m east to the WTP site. An access road from the WTP down to the new low lift pump station at the shoreline will also be required. - Associated site restoration works. - Following commissioning of the new WTP, decommission the existing WTP. Note also that upgrades to the distribution system will be performed in parallel to the above under a separate general construction contract. Documents are available at: www.merx.com *Cost estimate - ISC has agreed to commit a total of $59.8M to the WTP project, while the Chippewas of Nawash Unceded First Nation (CNUFN) will contribute $700K of own funds.

Under Construction

Water / Sewer

$60,500,000.00

Public - Federal

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
287
All Active Projects
110
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 31, 2021

March 21, 2022

September 22, 2023

img_map_placeholder

Wilmers Road and Pit Road, Lions Head, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.