BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Evansville, Indiana. Completed plans call for the construction of a bridge / tunnel.

https://www.insideindianabusiness.com/articles/federal-funding-could-speed-up-ohio-river-crossing-timeline Last week, the states of Indiana and Kentucky applied for more than $632 million in federal grant funding in support of the I-69 Ohio River Crossing (ORX) project. The $1.4 billion project, when complete, will extend Interstate 69 and connect Evansville with Henderson, Kentucky via a new, four-lane bridge over the Ohio River. _____________________________________________________________________________________ As of September 7, 2023, the Design-Builder for Section 1 has all subs in place. Construction for Section 1 began June 2022. Timeline for following sections could be moved up pending funding to begin as early as 2025. -West Alternative 1 is estimated to cost $1.47 billion. The proposal calls for a 4-lane I-69 bridge and a U.S. 41 bridge for local traffic, as well as a reconstructed U.S. 60 interchange and new Watson Lane and U.S. 41/Veterans Memorial Parkway interchanges. -West Alternative 2 is estimated to cost $1.49 billion. The proposal calls for a 6-lane I-69 bridge and would take away the two current U.S. 41 bridges and include a reconstructed U.S. 60 interchange and new Watson Lane, Wolf Hills/Stratman Road, Nugent Drive and U.S. 41/Veterans Memorial Parkway interchanges. -Central Alternative 1 is estimated to cost $1.42 billion. The proposal calls for a 4-lane I-69 bridge and use of one U.S. 41 bridge for local traffic, as well as new U.S. 41, U.S. 60 and Veterans Memorial Parkway interchanges. Section 1 - Focuses on improvements in Henderson and extends from KY 425 to US 60. • KYTC is overseeing the project. • Estimated cost: $237 million (year of expenditure) • Timeline: o 2020 – Design o 2021 – Right-of-way acquisition and utilities coordination o 2022-2025 – Construction As of October 2021, the Final Environmental Impact Statement and Record of Decision are complete Information regarding design team and contractor selection has not been disclosed. A firm timeline has not been established. Construction is expected to begin in 2022 and continue through 2025.

Award

Bridges / Tunnels

$159,735,300.00

Public - State/Provincial

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
20
Bidding Soon
499
All Active Projects
221
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 6, 2022

img_map_placeholder

I-69, Evansville, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.