BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Cape Coral, Florida. Completed plans call for site work for a water / sewer project.

**As of September 28, 2019, the project has been awarded but Award amount was not confirmed.** The proposed project shall generally be comprised of the acidization of selected existing Upper Floridan aquifer raw water production wells serving the North Reverse Osmosis (NRO) Water Treatment Plant (WTP) and/or the Southwest Reverse Osmosis (SWRO) Water Treatment Plant (WTP). The selected well Contractor shall be responsible for all labor, personal protective gear, materials, transportation, tools, supplies, equipment, and appurtenances necessary to plug back selected supply wells and perform the well acidization process on selected supply wells as described herein. In general, all methods and materials used during the execution of the work shall be in accordance with the latest revisions of the American Water Works Association (AWWA) Standards for Deep Wells (AWWA A100-06) as they apply to the needs or conditions encountered during the execution of the proposed Work. The Scope of Work for each selected well shall generally include, but is not limited to the removal of the permanent well pump; conduct pre-acidization/pre-plug back geophysical and video logging of the well; perform a plug back on selected supply wells; redevelop back plugged supply well; installation of the selected packer system/configuration (single or double) on selected supply well if applicable; acidizing the selected supply well; redevelopment of the supply well with compressed air; performing post-acidization geophysical and/or video logging of the well; reinstalling the permanent well pump; disinfection of the well; conducting a two-point bacteriological clearance of the well; and, site restoration of the well site/staging area. It should be noted that work on a selected well within a specific wellfield (NRO WTP Wellfield or SWRO WTP Wellfield) must be completed and the well back in service before work can begin on the next selected well within the same wellfield. Last Day for Questions: July 17, 2019 - No Later Than 4:00 PM.

Award

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
22
Bidding Soon
432
All Active Projects
168
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2019

August 29, 2019

img_map_placeholder

Multiple Locations, Cape Coral, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.