BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in San Clemente, California. Completed plans call for the renovation of a water / sewer project.

The contract does call for monthly progress payments based upon the engineer's estimate of the percentage of work completed. The City will retain 5 percent of each progress payment as security for completion of the balance of the work. At the request and expense of the successful bidder, the City will pay amounts so retained upon compliance with the requirements of Government Code Section 14402 and the provisions of the contract documents pertaining to "substitution of securities". Notice is further given that the Director of the Department of Industrial Relations, in accordance with Section 1770 of the California State Labor Code, has heretofore established a prevailing rate of per diem wages to be paid in the construction of the above entitled work. The said wage rates are herein referred to and adopted in this Notice as fully set forth herein, and said scale is made a part of this Notice by reference. Pursuant to Labor Code Section 1771.1, no contractor or sub-contractor may be listed on a bid proposal for a public works project submitted on or after March 1, 2015 unless registered with the Department of Industrial Relations. Furthermore, all bidders and contractors are hereby notified that no contractor or sub-contractor may be awarded a contract for public work on a public project unless registered with the Department of Industrial Relations. Pursuant to Labor Code Section 1771.4, all bidders are hereby notified that this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No bid will be accepted from a contractor who has not been licensed in accordance with the provisions of Chapter 9, Division III of the Business and Professions Code, State of California. Bidder shall possess a Class "A" California State Contracting License in good standing. Bidder shall have successfully completed a minimum of 3 verifiable long span (minimum of 10-feet clear span) aluminum odor control cover installation projects in wastewater treatment plant with a minimum valuation of $300,000 in the past 5 years. The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the plans, specifications and contract documents for the City of san clemente water reclamation plant primary clarifier covers (project no. 25206. in the City of San Clemente, California. Reference is hereby made to these Specifications for further particulars, and same are by such reference incorporated herein and made a part thereof, the same as though fully set forth hereunder The City of San Clemente reserves the right to reject any or all bids. Project duration: 150 calendar days. Liquidated Damages $800 per day. Response type Line item. Response format paper only. Type of award Lump sum.

Award

Water / Sewer

$799,610.00

Public - City

Renovation

1

1

11

3

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
563
Active Projects
277
Bidding Soon
4,013
All Active Projects
1,779
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 31, 2019

February 28, 2019

July 29, 2019

img_map_placeholder

390 Avenida Pico, San Clemente, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.