BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2024 at 7:00 PM

Updated December 13, 2024

Demolition, site work, paving and new construction of a civil project in Salem Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The project involves the replacement of three (3) existing 3 span structures carrying SR 81 NB and SB traffic over SR 3007 and Big Wapwallopen Creek, as well as the replacement of an existing one span structure carrying SR 81 NB traffic over SR 3010 and a culvert extension carrying SR 81 NB traffic over the Trib to Big Wapwallopen Creek along with approach roadway improvements. Replacement structures include three (3) single span P/S concrete spread box beam bridges with MSE wingwalls / abutments on steel piles and one (1) single span P/S concrete PA bulb tee beam bridge on steel piles. Additional work includes excavation, access road construction, shoulder work of culvert approaches, E & S control measures, guide rail and right-of-way fence replacement, rumble strips, pavement markings, permanent signing, and other miscellaneous construction work as necessary. Traffic will be accommodated using long term lane shifts to complete staged construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0081, SECTION D52 in LUZERNE COUNTY, DORRANCE TOWNSHIP from a point approximately 3.6 miles North of I-80 Interchange Exit #151 at Segment 1541 Offset 1727 (Station 754+90.00 SB) to a point at Segment 1551 Offset 0943 (Station 798+00.00 SB) and from Segment 1540 Offset 1065 (Station 749+50.00 NB) to a point at Segment 1550 Offset 0600 (Station 796+50.00 NB) and from a point at Segment 1560 Offset 0210 (Station 844+59.00 NB) to a point approximately 2.7 miles South of SR 3009 Interchange Exit #159 at Segment 1570 Offset 1068 (Station 905+95.00 NB) with a total work area length of 14,521.00 feet (2.750 miles). Project Cost Range: $25,000,000.00 - $29,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 46.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Required Completion: 07/07/2027 Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - I 81 Bridges Dorrance *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$30,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

622

11

74

3

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
250
Bidding Soon
1,897
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

January 27, 2025

Project location map

I 81, Salem Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.