Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published January 27, 2022 at 7:00 PM
Updated January 29, 2024
Site work and new construction of a pre-engineered storage facility in Tohatchi, New Mexico. Conceptual plans call for the construction of a pre-engineered storage facility.
The project is to plan and design, and construct a new warehouse on the Tohatchi chapter Compound including utilities (electric, natural gas, water,wastewater, house wiring and other types of equipment) on already withdrawn land. Phase #1: The Tohatchi Chapter Staff is currently working with the Navajo Nation Capital Projects Management Department (CPMD) and an Architect to complete the Plans and Design of the Warehouse Building. The Plans and Design is currently being worked on by LAM Corporation which he slated to be completed by February 2021. The proposed building is 40'x75' that will be used to store the Chapter's heavy equipment (six heavy equipment's) which is currently being stored at a private residential home. This is in violation of the Navajo Housing Authority polices and furthermore, the Auditors have also charged the Chapter with an Audit Finding and strongly recommends remediation. Phase II: The Phase II consists of the construction of Warehouse and hooking-up the utilities, both the main or primary utilities and inside the Warehouse. the proposed site is on withdrawn land and within Chapter property with access to Electric, Natural, Water, and Wastewater utilities. Construction can begin in July 2021 if the project can be funded. The Chapter has allocated $25,000 in matching funds toward the project. The Tohatchi Chapter will own, operate and maintain the building. The Navajo Nation will be the fiscal agent. The project is included in the New Mexico’s Department of Finance and Administration 2023-2027 Capital Improvement Program (CIP). As of January 27, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Warehouse / Distribution - Pre-Engineered Storage Building
$1,132,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2022
To Be Determined, Tohatchi, NM
Related To This Project
Tohatchi, NM
--
Tohatchi, NM
Bid Date: Oct 26 2023
Tohatchi, NM
Bid Date: Oct 15 2024
Tohatchi, NM
Bid Date: May 03 2024
Tohatchi, NM
--
Tohatchi, NM
Bid Date: Jun 21 2024
Tohatchi, NM
Bid Date: Mar 04 2022
Santa Fe, NM
Bid Date: Jan 27 2022
Truth or Consequences, NM
Bid Date: Nov 16 2021
Pueblo Pintado, NM
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed