BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Palmdale, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed project will implement a Complete Streets element that includes crosswalk enhancements, bulb-out crossings, new Class II bike lanes, traffic calming roundabouts, sidewalk gap closures, ADA-compliant curb ramps, and upgraded traffic control devices in Downtown Palmdale within the area bound by 9th Street East to the west, Avenue Q-9 to the north, 10th Street East to the east, and Avenue Q-12 to the south. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000 per day Start/Delivery Date August 2022 Project Duration 365 Days Caltrans Funded Project including Prevailing Wage Requirements Online Q&A Yes Q&A Deadline 05/17/2022 2:00 PM (PDT) The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer and/or his designee. The work may consist of but is not limited to: The proposed project will implement a "Complete Streets" element that includes crosswalk enhancements, bulb-out crossings, new Class II bike lanes, traffic calming roundabouts, sidewalk gap closures, ADA-compliant curb ramps, and upgraded traffic control devices in Downtown Palmdale within the area bound by 9th Street East to the west, Avenue Q-9 to the north, 10th Street East to the east, and Avenue Q-12 to the south. The work is estimated to cost approximately $3,000,000 and shall be completed in 365 calendar days.

Award

Sidewalks / Parking Lot

$6,405,637.00

Public - City

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
112
Bidding Soon
2,251
All Active Projects
1,008
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

August 1, 2022

img_map_placeholder

Multiple Locations, Palmdale, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.