Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Palmdale, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The proposed project will implement a Complete Streets element that includes crosswalk enhancements, bulb-out crossings, new Class II bike lanes, traffic calming roundabouts, sidewalk gap closures, ADA-compliant curb ramps, and upgraded traffic control devices in Downtown Palmdale within the area bound by 9th Street East to the west, Avenue Q-9 to the north, 10th Street East to the east, and Avenue Q-12 to the south. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000 per day Start/Delivery Date August 2022 Project Duration 365 Days Caltrans Funded Project including Prevailing Wage Requirements Online Q&A Yes Q&A Deadline 05/17/2022 2:00 PM (PDT) The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer and/or his designee. The work may consist of but is not limited to: The proposed project will implement a "Complete Streets" element that includes crosswalk enhancements, bulb-out crossings, new Class II bike lanes, traffic calming roundabouts, sidewalk gap closures, ADA-compliant curb ramps, and upgraded traffic control devices in Downtown Palmdale within the area bound by 9th Street East to the west, Avenue Q-9 to the north, 10th Street East to the east, and Avenue Q-12 to the south. The work is estimated to cost approximately $3,000,000 and shall be completed in 365 calendar days.
Award
Sidewalks / Parking Lot
$6,405,637.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2022
August 1, 2022
Multiple Locations, Palmdale, CA
Related To This Project
Palmdale, CA
--
Palmdale, CA
--
Palmdale, CA
Bid Date: Sep 22 2021
Palmdale, CA
--
Palmdale, CA
Bid Date: Apr 25 2019
Palmdale, CA
Bid Date: Dec 17 2019
Palmdale, CA
Bid Date: May 16 2022
Palmdale, CA
Bid Date: Apr 15 2021
Palmdale, CA
--
Palmdale, CA
--
Palmdale, CA
Bid Date: Jan 14 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.