BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2019 at 8:00 PM

Updated July 24, 2025

Site work, new construction and renovation of a mixed-use development in Clinton, Massachusetts. Completed plans call for the renovation of a 2,913-square-foot, one-story above grade municipal facility; and for site work for a municipal facility.

A general contractor has been selected. Construction will not start prior to May 20, 2019. The proposed contract includes a combined participation goal of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE participation Construction of new Clinton Maintenance Headquarters Building: Excavation and backfill, new foundation and slab on grade, rough plumbing and underground utility entrances, related utility connections. New water line from Wilson Street, new valve connections to existing water feeds, underground duct banks for electrical and telephone/data service by others. The work is to be accomplished within 270 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions).

Bid Results

Municipal

$1,190,000.00

Public - State/Provincial

New Construction, Renovation, Site Work

41

20

46

8

Subscribe For Documents

122 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
706
Active Projects
385
Bidding Soon
4,869
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2019

May 20, 2019

Project location map

500 Wilson St, Clinton, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.