Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 21, 2025 at 8:00 PM
Updated July 22, 2025
Site work and new construction of an educational facility in Clinton, Massachusetts. Working plans call for the construction of a educational facility; and for site work for a educational facility.
Estimated Total Overall Construction Cost: $114,277,257.00 The prequalification committee is accepting qualifications for the Masonry, Misc. and Ornamental Iron; Waterproofing and Damp proofing, and Caulking Pt.2; Roofing and Flashing; Metal Windows; Glass and Glazing; Tile; Acoustical Tile; Resilient Floors; Painting; Fire Protection; Plumbing; Heating, Ventilation, and Air Conditioning; Electrical bids for the New Clinton Middle School. Masonry, Misc. and Ornamental Iron; Waterproofing and Damp proofing, and Caulking Pt.2; Roofing and Flashing; Metal Windows; Glass and Glazing; Tile; Acoustical Tile; Resilient Floors; Painting; Fire Protection; Plumbing; Heating, Ventilation, and Air Conditioning; Electrical Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
Final Planning
Educational
$114,277,257.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
December 8, 2025
100 W Boylston St, Clinton, MA
Related To This Project
Clinton, MA
Bid Date: Aug 25 2025
Clinton, MA
Bid Date: Mar 13 2019
Clinton, MA
Bid Date: Sep 11 2025
Clinton, MA
Bid Date: Aug 12 2025
Clinton, MA
Bid Date: Aug 21 2025
Clinton, MA
Bid Date: Aug 14 2025
Clinton, MA
Bid Date: Sep 26 2025
Clinton, MA
Bid Date: Oct 30 2025
Clinton, MA
--
Clinton, MA
Bid Date: May 01 2025
Clinton, MA
Bid Date: Apr 29 2025
Clinton, MA
Bid Date: Apr 10 2025
Clinton, MA
Bid Date: Apr 17 2025
Clinton, MA
Bid Date: Apr 09 2025
Clinton, MA
Bid Date: Mar 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
