BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Everett, Washington. Working plans call for site work for a road / highway; and for paving for a road / highway.

STIP ID WDNW-1147 To analyze, design and construct SR 526 corridor modifications that improve mobility and provide reliable travel for people, goods and services. Construct access ramps on SR 526 at Hardeson Road to improve traffic flow on SR 526 and local streets within the southwest Everett industrial area. Access will be provided for SR 526 traffic to and from the east. The westbound off-ramp will access 80th Street SW instead of Hardeson Road due to the location of the Federal Post Office facility. As of November 24, 2022, this project is in final planning status. Preliminary engineering has begun and environmental design is expected to be complete in the second quarter of 2019. The contract advertisement is expected in four quarter of 2021 and construction is anticipated to be operationally complete in the second quarter of 2023. WSDOT - SR 526 Corridor Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$39,197,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
49
Bidding Soon
940
All Active Projects
349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

img_map_placeholder

WA-526, Everett, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.