BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2021 at 8:00 PM

Updated February 13, 2024

Renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a educational facility.

**As of May 11,2021 This project been awarded. Start date is May 17, 2021 and completion date has not yet been established.** The Project is generally described as: Provision of equipment, devices, appliances, accessories, design, installation and testing of a complete new fire alarm system as defined in drawings and specifications by William Duff Architects and their consulting engineers, Johnson Controls Inc. dated 01/26/2020 and any such subsequent addendums and instructions. The area of work will be occupied during the construction phase and work hours will be constrained by the user group as further described. The project has been approved by SFDBI. Provide unit pricing for each type of field device and appliance utilized in the fire alarm system. Include costs for installation, materials, programming and testing in the unit pricing. Remove existing fire alarm system upon completion and acceptance of the new fire alarm system. The estimated construction value of the Work is between $350,000 - $550,000. Each Bid Proposal shall be accompanied by Bid Security in an amount not less than ten percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). Failure of any Bid Proposal to be accompanied by Bid Security in the form and in the amount required shall render such Bid Proposal to be nonresponsive and rejected by the District. The San Francisco Unified School District is an Equal Opportunity employer and requires that, if subcontractors are used, reasonable, good-faith outreach efforts be made to all subcontractor enterprises in the local community including African-Americans, Caucasians, Hispanics, Asians, Women and others without discrimination on the basis of race, color, religion, sex or natural origin. We encourage employing residents of the community where the Project is located.

Award

Office

$698,300.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
149
Bidding Soon
3,107
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2021

April 16, 2021

Project location map

1235 Mission St, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.