BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2019 at 8:00 PM

Updated October 24, 2023

Demolition, site work, renovation and addition to a mixed-use development in Leadville, Colorado. Completed plans call for the addition of a 14,900-square-foot library; for the renovation of a library; for the demolition of a library; and for site work for a library.

As of June 7th, 2019, this project has not yet been awarded. A timeline for award has not yet been established. Question Acceptance Deadline 01/22/2019 04:00 PM EST Colorado Mountain College's Leadville Campus located at 901 South Hwy 24, Leadville, CO, in partnership with Get Outdoors Leadville! ("GOL!") is requesting quotes from qualified general contracting firms to construct a 2500 square foot addition to its existing Climax Building (size of current facility is 14,900sf). This addition will house the programmatic needs for the GOL! Community Gear Library and hub as shown in the 100% Construction Drawings and specifications. The project has gone through code review and has been approved through the Colorado Division of Fire & Prevention Services. The scope of services will include full Construction Contracting Services during the process of construction and warranty period. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the Owner. The Community Gear Library will support access to the outdoors by: 1. Providing equipment for a range of outdoor activities - mountain biking, Nordic skiing, hiking, and camping. 2. Teaching workshops to build community members' skills and comfort outdoors including outdoor leadership trainings, bike maintenance 101, Leave No Trace, backcountry cooking, and more! 3. Facilitating outdoor programming for local youth and families. The GOL! Hub will support access to the outdoors by: 1. Being a safe space for learning, gathering, and launching outdoor adventures. 2. Providing information and programming in English and Spanish for all community members. 3. Fostering a sense of camaraderie and connections -- among people and with the natural world. SPECIFICATIONS o Approved 100% Construction Documents o Approved Construction Plan o Geotechnical Report o Inspection Card o Envelope Compliance Certificate TIMELINE Construction is anticipated to start May 6, 2019 and be completed by December 31, 2019. MINIMUM QUALIFICATIONS Notice is hereby given to all interested parties that all firms will be required to meet ALL of the minimum qualifications to be considered for this project. To be considered as qualified, interested firms shall have, as a minimum: 1. Provided construction contracting services within the last five (5) years for at least three (3) projects each in excess of $500,000 (hard costs). 2. Demonstrated specific experience in projects of similar scope and complexity such as o Education facilities o Wellness/Recreation Centers o Working in an occupied facility 3. Demonstrated bonding capability up to $ 500,000 for an individual project coinciding with current and anticipated workloads; provide letter from surety that affirms this capacity.

Post-Bid

Library

$400,000.00

Public - State/Provincial

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
46
Bidding Soon
728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2019

July 15, 2019

Project location map

901 US-24, Leadville, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.