Site work and paving for a civil project in Toronto, Ontario. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The scope of the BFPP Assignments includes sewer and storm drainage improvement, including but not limited to sanitary sewer upgrades, storm sewer upgrades, open channels, in line storage (oversized pipes and precast concrete box units etc.), stormwater management facilities (underground storage tanks, wet/dry ponds, artificial wetlands, etc.), low impact development measures, catch basin inlet controls, outfall/outlet control structures and additional associated municipal infrastructure work and appurtenance which may be impacted by these assignments. The Assignments may also include road resurfacing and/or reconstruction, road and/or other right-of-way (ROW) element restoration, other sewer or watermain replacements, lateral services replacements (sewers and watermain), other utility relocation, as required. TIMELINE: The Civil Engineer has completed detailed engineering design for BFPP4 Assignments/Projects. The Consultant will also provide contract administration (DDCA) services for the Assignments as projects are identified to proceed to tender. Projects will be followed once approved for bid. Coverage discontinued. It is the City's intent to assign 2 additional, currently undefined Projects to the Consultant, with an aggregate construction value of up to the difference between the Maximum Construction Cost (MCC) value stipulated in Section 5 of this RFP and the aggregate value of the Projects defined in Appendix E. These additional Projects would be assigned within one year of award of this RFP, once further preliminary designs have been completed and accepted by the City, at the City's discretion; however, the City does not guarantee that the additional Projects will be assigned to the Consultant. These additional Projects would be tendered as 2 additional construction contracts (1 for each Project), each with an estimated construction schedule duration of up to 24 months.
Project Abandoned
Water / Sewer
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2020
Multiple Locations, Toronto, ON
Related To This Project
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Oct 26 2018
Toronto, ON
--
Toronto, ON
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.