Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in College Station, Texas. Conceptual plans call for site work for a water / sewer project.
In 2012, City staff worked with Jones & Carter Engineers to identify a trunk sewer alignment that would provide gravity service to the proposed medical district bounded by SHWY6, Rock Prairie Road, and WD Fitch. The study also considered the decommissioning of the Rock Prairie lift station and Lift Stations #2 & #3. The results of the study identified a route that consists of the continuation of inflow gravity sewer at each lift station, then crossing SHWY6 and roughly following the 100-year flood plain boundary of Lick Creek and Lick Creek Tributary 12, concluding at an existing manhole on the north side of Fitch. The route analysis included two separate trunk sewer phases. Phase II begins at lift station #3, located south of Graham Road, and continues along Lick Creek prior to converging with an existing line near WD Fitch. Phase III begins at lift station #2, located north of Barron Road, and continues along Lick Creek Tributary 12 prior to converging with Phase II. This project is included in the city's Fiscal Year 2024-2029 Capital Improvement Program. As of December 14, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$1,939,791.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2024
Multiple Locations, College Station, TX
Related To This Project
College Station, TX
--
College Station, TX
Bid Date: Jan 23 2024
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Dec 12 2023
College Station, TX
Bid Date: Jan 04 2024
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.