BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a civil project in Clovis, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The project consist of widening Shaw Avenue between Leonard and McCall Avenues from a two-lane rural road to a five- to six- lane urban arterial street. Project will construct between Leonard and Highland Avenues three westbound lanes, three eastbound lanes, bike lanes and a raised median; and between Highland and McCall Avenues construct two westbound lanes, three eastbound lanes, bike lanes, and a raised median. Project will install streetlights, traffic signal and other facilities normally found along a major street. This project will install traffic signals components at the intersections of Shaw Avenue with Leonard and McCall Avenues; construct some of the water, recycled water and sewer main facilities planned for the project area; install all of the storm water facilities the Fresno Metropolitan Flood Control District has planned for the project area. The project also includes the installation of one concrete box culvert at Dog Creek and two prefabricated concrete culverts at Dog Creek Tributaries #1 and #2. The project has been broken down into two phases. The first phase will include all improvements east of Leonard Avenue and the second phase will include all improvements between DeWolf and Leonard Avenues, including the construction of an overpass that will allow direct connection of the commercial developments on the north and south sides of Shaw Avenue. Funding for this project is from the Regional Measure C and Local Funds As of May 11, 2022, this project is underway. It has not been confirmed that all trades are let. Construction could take 10 to 12 months to complete this phase. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Roads / Highways

$12,349,563.00

Public - City

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
35
Bidding Soon
663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

April 25, 2022

Project location map

Multiple Locations, Clovis, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.