BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2020 at 7:00 PM

Updated October 24, 2023

Demolition, site work, paving and new construction of a mixed-use development in North Attleboro, Massachusetts. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of February 18, 2020. Project has been Cancelled. No specific date for a re bid. Estimated Cost: $2,000,000 Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Removal and replacement of the Chestnut Street Bridge over Ten Mile River, and approximately 1100 of water main replacement. Work includes replacing the existing bridge with a precast concrete three-sided culvert; installation of drilled concrete-filled micro piles, precast concrete footings, wall reconstruction, metal bridge railings, and approach slabs; utility relocation; excavation; milling and resurfacing; geometric improvements; installation of sidewalk and curbing; installation of drainage structures; replacement of water main; and other work. There will not be a pre-bid meeting for this project.

Final Planning

Bridges / Tunnels

$1,755,245.00

Public - City

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
586
Active Projects
272
Bidding Soon
4,011
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2020

August 21, 2020

Project location map

Chestnut St, North Attleboro, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.