Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2025 at 7:00 PM
Updated November 12, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in North Las Vegas, Nevada. Working plans call for the construction of a bridge / tunnel; for paving for a bridge / tunnel; for site work for a bridge / tunnel; and for the demolition of a bridge / tunnel.
As of November 11, 2025, this Project is on hold. This project consists of furnishing all labor, materials, delivery, transportation and all associated services for the Craig Road Pedestrian Bridge Project (CIP # 10513) at the Upper Las Vegas Wash. The pedestrian bridge will connect the multi-use trail across Craig Road, near Berg Street. This work consists of a 10-foot-wide ADA-compliant pedestrian bridge crossings with associated approach ramps, multi-use trail including a 10-foot-wide asphalt concrete path, with t access from the bridge crossings to the street, stair access to the pedestrian bridges, drought-tolerant landscaping, irrigation systems, trail lighting, trail nodes, rest stops, and other necessary appurtenances to make a complete and serviceable project. The Project shall be completed within 300 consecutive calendar days from the date specified in the Notice to Proceed, which time shall include resolution of all punch list items, final cleanup and demobilization. The estimated monetary range of the project is: $3,200,000 to $3,400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A PREBID CONFERENCE will not be held for this project. Any questions should be submitted to Glenn Blake, Senior Engineer, City of North Las Vegas, by email at blakeg@cityofnorthlasvegas.com. All questions must be submitted in writing and received no later than 12:00 Noon on Tuesday, September 24, 2024.
Final Planning
Bridges / Tunnels
$5,803,076.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2024
June 8, 2026
Upper Las Vegas Wash Trail, North Las Vegas, NV
Related To This Project
North Las Vegas, NV
--
North Las Vegas, NV
--
North Las Vegas, NV
--
North Las Vegas, NV
--
North Las Vegas, NV
--
North Las Vegas, NV
--
North Las Vegas, NV
--
North Las Vegas, NV
--
North Las Vegas, NV
Bid Date: Feb 01 2023
North Las Vegas, NV
--
North Las Vegas, NV
Bid Date: May 04 2026
North Las Vegas, NV
Bid Date: Sep 11 2024
North Las Vegas, NV
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
