BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in North Las Vegas, Nevada. Completed plans call for the construction of a bridge / tunnel; for paving for a bridge / tunnel; for site work for a bridge / tunnel; and for the demolition of a bridge / tunnel.

This project consists of furnishing all labor, materials, delivery, transportation and all associated services for the Craig Road Pedestrian Bridge Project (CIP # 10513) at the Upper Las Vegas Wash. The pedestrian bridge will connect the multi-use trail across Craig Road, near Berg Street. This work consists of a 10-foot-wide ADA-compliant pedestrian bridge crossings with associated approach ramps, multi-use trail including a 10-foot-wide asphalt concrete path, with t access from the bridge crossings to the street, stair access to the pedestrian bridges, drought-tolerant landscaping, irrigation systems, trail lighting, trail nodes, rest stops, and other necessary appurtenances to make a complete and serviceable project. The Project shall be completed within 300 consecutive calendar days from the date specified in the Notice to Proceed, which time shall include resolution of all punch list items, final cleanup and demobilization. The estimated monetary range of the project is: $3,200,000 to $3,400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A PREBID CONFERENCE will not be held for this project. Any questions should be submitted to Glenn Blake, Senior Engineer, City of North Las Vegas, by email at blakeg@cityofnorthlasvegas.com. All questions must be submitted in writing and received no later than 12:00 Noon on Tuesday, September 24, 2024.

Post-Bid

Bridges / Tunnels

$3,400,000.00

Public - City

Demolition, New Construction, Paving, Site Work

49

7

9

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
18
Bidding Soon
429
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

December 2, 2024

img_map_placeholder

Upper Las Vegas Wash Trail, North Las Vegas, NV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.