BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a detention facility in Fort Collins, Colorado. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for the renovation of a detention facility; and for site work for a detention facility.

As of June 2020, an architect and general contractor have been identified. A groundbreaking ceremony took place on June 17, 2020, and official construction began in July 2020. Construction is anticipated to take 34 months to complete. The original solicitation is included below: The Project includes pre-construction and construction services for the Larimer County Jail expansion and renovation project. All questions regarding this RFP must be in writing and should go to Les Brown, Purchasing Agent, at brownxld@larimer.org. Questions are due no later than 10:00 a.m. (our clock) January 25, 2019. Please call Les Brown at 970-498-5954 to verify receipt of your questions. No questions will be accepted after the date and time referenced above. All questions received will be answered via Addendum only. Six (6) paper proposals and one (1) .pdf proposal (matching the paper proposal exactly) on one (1) FLASH DRIVE is required. If the paper proposal and the .pdf differ, the .pdf shall be the proposal of record. Firms are requested to also provide a "Redacted Copy" of their proposal on the FLASH DRIVE, which, adhering to the information provided in the next paragraph, will be used to satisfy open records requests. Firms that do not provide a redacted copy will have their electronic copy used to satisfy open records requests. Redacted responses should not include information which the proposer believes to be trade secret or other privileged or confidential data. If brochures or other supportive documents are requested, then it is required that they be submitted with both your paper and electronic proposals.

Under Construction

Jails / Prisons

$75,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
40
Bidding Soon
939
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2019

July 6, 2020

img_map_placeholder

2405 Midpoint Dr, Fort Collins, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.