BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2019 at 8:00 PM

Updated March 17, 2026

Site work and paving for a mixed-use development in Lake Havasu City, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Tracs No 095 MO 184 F0029 01C Proj NoHSIP-095-C(220)T Termini Quartzsite - Parker - Topock Highway Location SR 95 at Kiowa Boulevard Route No. Milepost District Item No. SR 95 184.40 -184.70 NORTHWEST 8377 This project is being re-advertised. Firms that already obtained contract documents are instructed to destroy them as the contract documents have been revised. All bidders and subcontractors may download the revised project documents from the Contracts and Specifications Website. Contractors that previously registered for the project are advised to register for the re-advertised project. The amount programmed for this contract is $1,690,000. The location and description of the proposed work are as follows: The project is located in Mohave County on SR-95, within the Lake Havasu City limits. The work consists of constructing right turn lanes and raised medians. The work also includes constructing traffic signal, sidewalk, curb and gutter, ADA ramps and other related work. The time allowed for the completion of the work included in this project will be 140 Working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 7.78. All labor employed on this project shall be paid in accordance with the minimum wage rates shown in the General Wage Decision. These rates have been determined in accordance with the requirements of the law and issued by the Secretary of Labor for this project. The wage scale is on file in Contracts and Specifications Section and copies may be obtained at all reasonable times. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. Questions and comments concerning the bid package for this project shall be directed to the individuals noted below: Engineering Specialist: Jalal Kamal Jkamal@azdot.gov Construction Supervisor: Allison Baker ABaker@azdot.gov AZDOT - Quartzsite - Parker - Topock Highway (SR 95 at Kiowa Boulevard)

Award

Roads / Highways

$1,395,146.00

Public - State/Provincial

Paving, Site Work

92

4

2

11

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
44
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2019

June 11, 2019

Project location map

AZ-95, Lake Havasu City, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.