Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2019 at 8:00 PM
Updated February 5, 2026
Renovation of a power facility in Folsom, California. Completed plans call for the renovation of a power facility.
*Contract Award Date: June 21, 2019 Contract Award Number: 140R2019C0013 Contract Award Dollar Amount: $3,163,020.00 Contractor Awarded DUNS: 834870776 Contractor Awardee: SEA PAC ENGINEERING, INC. 222 N HARVARD BLVD LOS ANGELES CA 90004-4319 US This announcement is to small business, 8(a) Small Business, HUBZone Small Business, Woman-Owned Small Business and Service-Disabled Veteran-Owned Small Business concerns that may be interested in performing a contract for the Mid-Pacific Region of the Bureau of Reclamation. The work to be performed is described below. Based upon response to this announcement, the Government may determine to set this acquisition aside or proceed with an unrestricted solicitation. The applicable North American Industry Classification System (NAICS) Code is 238220 and the related small business size standard is $15M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this project is between $1,000,000.00 and $5,000,000.00. The work is located at Folsom Dam, City of Folsom, California in Sacramento County. Interested parties should include the following information in their response: (a) Business name, address, cage code, size classification based on NAICS size standard, socioeconomic classification (i.e. HUBZone and/or 8(a)), and a point of contact; (b) A positive statement of your intention to submit an offer for this solicitation as a prime contractor; (c) Evidence of your experience performing work similar in type and scope to the work in this announcement within the last five years. The evidence should include: contract numbers, project titles, dollar amounts and points of contacts with telephone numbers. Please do not include more than three past projects; and (d) Include attachments cataloging the company's equipment assets, personnel resources and financial resources that demonstrate company responsibility and capability to perform required work. The information provided in this announcement is all information the Government has available at this time. There are no specifications, drawings, bid packages, or source lists available. Prospective contractors MUST be actively registered in the System for Award Management (SAM) database at sam.gov to be eligible for award. Principal Components of Work A. Fire Alarm Systems: 1. Provide new fire alarm system for the following locations: a. Folsom Powerplant. b. Standby Generator Building. c. Cable Tunnel between Folsom Powerplant and Switchyard. d. Switchyard UHA Building. 2. Remove and dispose of existing fire alarm system components at locations where new fire alarm system is installed. B. Stairwell Ventilation Control: 1. Replace ventilation controls for Emergency Exit Stairs, shown in drawing 485-D-2249. 2. Remove and dispose of existing NSCP1 Fan Control Panel. C. HVAC: 1. Remove and replace existing 15-ton water-cooled heat pump with new 20-ton water-cooled heat pump. 2. Remove and replace one (1) 3-ton water cooled computer room cooling with two (2) 5-ton water-cooled computer room cooling units. 3. Refurbish all HVAC system components as described in 23 00 00 Heating, Ventilation and Air-Conditioning (HVAC). D. Fire Doors: 1. Remove and dispose the following: a. One (1) double swinging door, door frame, and associated hardware and features between rooms 204 and 207. b. One (1) single swinging door, door frame, and associated hardware and features between rooms 204 and 205. 2. Furnish and install the following: a. One (1) fire-rated double swinging door, door frame, and associated hardware and features between rooms 204 and 207. b. One (1) fire-rated single swinging door, door frame, and associated hardware and features between rooms 204 and 205. E. Lighting Replacement: 1. Provide new lighting system in identified areas and remove and dispose of existing system components at locations where new system is installed. F. Acoustical Ceilings: 1. Investigate acoustical ceiling system structural supports for compliance with applicable codes and standards. Design, furnish, and install new structural supports as required. Remove and dispose, and/or modify existing structural supports as required. 2. Remove and dispose the following: a. Ceiling panels, suspension systems, and associated features in the following rooms: 1) Floor El. 165.00: a) Toilet Room 301, Janitor Room 302, Control Room 303, Toilet Room 304, CVO Control Room 305, Computer Room 306, Locker Room 307, and Hallway adjacent to Rooms 301, 302, and 307 (no room number). 2) Floor El. 180.00: a) Lobby Room 401, Vestibule Room 402, Mens Toilet Room 403, Janitor Room 404, Womens Restroom Room 405, Womens Toilet Room 406, Breakroom / Kitchen Room 408, Storage Room 409, Communications Room 410, Auditorium Room 411, and Unnamed Area adjacent to Rooms 401, 404, 408, 410, and 411 (no room number). 3. Design, furnish, and install the following: a. Ceiling panels, suspension systems, and associated features in the following rooms: 1) Floor El. 165.00: a) Toilet Room 301, Janitor Room 302, Control Room 303, Toilet Room 304, CVO Control Room 305, Computer Room 306, Locker Room 307, and Hallway adjacent to Rooms 301, 302, and 307 (no room number). 2) Floor El. 180.00: a) Lobby Room 401, Vestibule Room 402, Mens Toilet Room 403, Janitor Room 404, Womens Restroom Room 405, Womens Toilet Room 406, Breakroom/Kitchen Room 408, Storage Room 409, Communications Room 410, Auditorium Room 411, and Unnamed Area adjacent to Rooms 401, 404, 408, 410, and 411 (no room number). G. Painting Walls: 1. Repair and paint walls in the following rooms: a. Floor El. 165.00: 1) Toilet Room 301, Janitor Room 302, Control Room 303, Toilet Room 304, CVO Control Room 305, Computer Room 306, Locker Room 307, and Hallway adjacent to Rooms 301, 302, and 307 (no room number). b. Floor El. 180.00: 1) Lobby Room 401, Vestibule Room 402, Mens Toilet Room 403, Janitor Room 404, Womens Restroom Room 405, Womens Toilet Room 406, Breakroom/Kitchen Room 408, Storage Room 409, Communications Room 410, Auditorium Room 411, and Unnamed Area adjacent to Rooms 401, 404, 408, 410, and 411 (no room number). H. Miscellaneous Electrical and Control Work: 1. Miscellaneous electrical and control work to accommodate system modifications included in this contract. I. Work for identified scope items includes at minimum: 1. Field investigation of systems and drawings. 2. System design and analysis. 3. Demolition. 4. Installation. 5. Furnish equipment and components. 6. System programing. 7. Testing and Commissioning. 8. Training.
Award
Hydroelectric Power Generation
$3,163,020.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2019
June 13, 2019
7794 Folsom Dam Rd, Folsom, CA
Related To This Project
Folsom, CA
Bid Date: Mar 12 2026
Folsom, CA
Bid Date: Mar 12 2026
Folsom, CA
--
Folsom, CA
Bid Date: Mar 30 2026
Folsom, CA
Bid Date: Mar 27 2026
Folsom, CA
--
Folsom, CA
Bid Date: Feb 26 2026
Folsom, CA
Bid Date: Jan 12 2026
Folsom, CA
Bid Date: Dec 18 2025
Folsom, CA
Bid Date: Dec 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
