BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a road / highway in Pinellas Park, Florida. Completed plans call for site work for a road / highway.

** Florida Safety Contractors, Inc. is the awarded bidder with the awarded amount of $2,160,181.25.** This project consists of the installation of conduit, fiber optic cable, dynamic message signs and associated structures, CCTV cameras and associated poles, vehicle detection systems, its field cabinets, concrete barrier wall, and guardrail. Take special note of the lobbying clause in section a of each soliciation. By signing your submittal your firm agrees to adhere to pinellas county board of county commissioners rules in regards to lobbying. Project no. T041615.082, 002598A, CSX858401, 434891 1 54 01 The COUNTY will construct an Advanced Traffic Management System (ATMS)/lntelligent Transportation System (ITS) on Alternate US 19 South, from US 19 to SR 60 The project includes installation of conduit and fiber optic cable and video vehicle detection system along Missouri Avenue (Alt US 19) from Ulmerton Road to SR 60, and installation of CCTV cameras and dynamic message sign structures from US 19 to SR 60. Nine CCTV cameras and eight DMS structures are currently planned within the scope of the project. Pinellas Counly certifies to the Department that all fiber and ATMS devices will only be used for State Road corridor transportation related uses and that conduit installed with this project will not be used for non-transportation purposes Pinellas County shall maintain all devices and be responsible for management and operation of the system. The DEPARTMENT will be provided access to the system as requested and/or necessary. If the DEPARTMENT subsequently determines the COUNTY'S fiber and conduit are being used for non-transportation related purposes, the COUNTY shall remove the fiber and conduit at its sole expense within 30 days of notification by the DEPARTMENT.

Award

Roads / Highways

$2,160,181.00

Public - County

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
51
Bidding Soon
903
All Active Projects
347
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2018

October 29, 2018

img_map_placeholder

US-19, Pinellas Park, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.