BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2020 at 8:00 PM

Updated September 14, 2023

Site work for a playground / park / athletic field in Anaheim, California. Completed plans call for site work for a playground / park / athletic field.

As of October 2020, construction is underway. The electronic proposals shall be tabulated by the Anaheim City Engineer and the results thereof reported to the City Council for consideration at a meeting to be held no later than 45 days after the bid opening. It shall be mandatory upon the contractor to whom the contract is awarded, and upon any subcontractor under them, to pay not less than the higher of the two rates contained in the current general prevailing wage rate(s) and per diem rate(s), established by the Director of the Department of Industrial Relations of the State of California, (as set forth in the Labor Code of the State of California, commencing at Section 1770 et seq.), or by the Secretary of Labor (as set forth in Davis-Bacon Act, 40 U.S.C. 267a, et seq.). The original Bid Bond or Cashier's Check for 10% of the amount of the Bid made payable to the City of Anaheim, shall be submitted to the City Clerk prior to the Bid Due Date and Time noted above or as revised via addendum to the project documents. Estimated Bid Value: $748,950-$785,500

Under Construction

Playgrounds / Parks / Athletic Fields

$785,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

134 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
631
Active Projects
261
Bidding Soon
3,648
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2019

December 2, 2019

Project location map

E Julianna St, Anaheim, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.