BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Duluth, Minnesota. Conceptual plans call for the construction of a 350-bed, 300-seat educational facility.

As of October 8, 2021, the project has been been canceled due to implications from the pandemic. This project has a budget of $70 million -- $50 million for the dormitory and $20 million for the dining facility. The dormitory will be 10 stories and provide housing for 350 students. The new dining facility will support those additional students living on campus as well as ease the burden on the school's current dining hall, which is at capacity. Construction is slated to begin in May 2020. The dining hall is expected to open by summer 2021, while the new dormitory will be ready for residents by the start of the 2021 fall semester. Only pre-design work has been completed so far. The plans are in the schematic phase. "That's what happens in schematic -- you're kind of taking Lego blocks and kind of putting them together," Smyth said. In September, of 2019, design development will begin, when architects will determine exact square footage and measurements. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Project Abandoned

Educational

$49,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
100
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2021

img_map_placeholder

1049 University Dr, Duluth, MN

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.