BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Weston, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a road / highway; and water / sewer project.

Counties:Broward Road Name: Sr 93 (I-75) and Sr 84 Limits:From W of Us 27 to the I-595 Interchange and From Glades Pkwy to Weston Rd Project(s): 43811715201 Federal Aid No: D421023B Project(s): 43811715202 Federal Aid No: N/A Project(s): 44166815201(*) Federal Aid No: D421022B Total Roadway Length: 14.890 Miles Contract Days: 480 Total Bridge Length: 0.223 Miles Total Proposal Length: 15.113 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Calendar Days The improvements under this contract consist of , but are not limited to, asphaltic concrete (milling, overbuild, resurfacing, miscellaneous), guardrail, pavement markings, fiber optic, ITS (including wrong-way vehicle detection with electrical service), traffic monitoring sites, and sod on SR 93 (I-75). Additionally, improvements include but are not limited to asphaltic concrete mix (milling, resurfacing, overbuild, minor widening), guardrail, pavement markings, drainage, lighting, minor signalization and Utility Work by Highway Contractors (adjustment of valves and manholes) on SR 84. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 009 - Bike Lane / Sidewalk - SR 93 (I-75) and SR 84

Award

Roads / Highways

$12,487,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
46
Bidding Soon
1,109
All Active Projects
492
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2021

May 7, 2021

img_map_placeholder

FL-93, Weston, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.