BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in San Bernardino, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of February 12 2021, this project is in construction. Shortlist confirmed San Bernardino County Transportation Authority ("SBCTA"), in partnership and cooperation with the City of San Bernardino, the California Department of Transportation ("Caltrans") and the Federal Highways Administration ("FHWA"), presents this Request for Qualifications (as modified by any addenda, this "RFQ") to prospective entities or groups of entities interested in undertaking the demolition and reconstruction of the Mount Vernon Avenue Viaduct (State Bridge No. 54C-0066) located in the City of San Bernardino, California, using a Design-Build methodology following the completion of the procurement process set out in this RFQ ("Project"). The Project is more fully described in Sections 3 and 6. Overall, the work for the Project generally consists of demolishing the existing Bridge, which Caltrans determined to be structurally deficient, and constructing a new wider bridge on a similar horizontal alignment and with a slightly higher profile. The work for the Project will also include the reconstruction of the intersections at 2nd Street and Mt. Vernon Avenue, Kingman Street and Mt. Vernon Avenue, as well as other associated work. SBCTA will act as the lead agency for the Project and has been delegated design review authority by the City and will be responsible for coordinating City approval. The City will retain final design approval authority. completion of all work by 2022 The Project has been a high priority for the City for more than 15 years. In 1997, Caltrans inspectors determined that the Existing Bridge had a sufficiency rating of less than 50 out of a possible 100. Bridges rated less than 50 are considered to be structurally deficient and functionally obsolete. The current sufficiency rating of the Existing Bridge is 2. Since 2004, the Existing Bridge has been closed to traffic twice to shore up support columns. Although it remains in service for passenger vehicles, commercial vehicles are no longer allowed to cross the Existing Bridge. b. The purpose of the Project is to provide a replacement bridge that is structurally safe and meets current seismic, design, and roadway standards.

Under Construction

Bridges / Tunnels

$65,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

150 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
120
Bidding Soon
2,122
All Active Projects
1,001
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2018

January 13, 2021

img_map_placeholder

S Mt Vernon Ave, San Bernardino, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.