Demolition, site work, renovation and addition to a mixed-use development in Bowling Green, Ohio. Completed plans call for the addition of a 11,000-square-foot, 72-bed detention facility; for the renovation of a 26,644-square-foot detention facility; for site work for a sidewalk / parking lot; and water / sewer project.
*As of September 23, 2022, the bid process is complete. Contracts will be awarded in late September 2022. All questions concerning this RFQ shall be directed in writing via email to Garry McAnally,Wachtel and McAnally Architects/Planners, Inc The Project site is an active jail and site visits will not be permitted during the RFQ phase.Shortlisted firms will have the opportunity to visit the site during the RFP phase. Project Overview, Schedule, and Owner Budget: A. This Project is anticipated to include additions to and renovations of the existing Wood County Jail. Preliminary design documents developed by Wachtel & McAnally will be available to the shortlisted firms at the RFP phase of procurement. Additional square footage of approximately 4230 sq ft on the first floor and 4918 sq ft on the second floor is anticipated. The Project is anticipated to include, but is not limited to: new mechanical room new intake area renovation of existing intake area to create office/medical offices/exam area renovation of existing medical area into secured offices and classrooms remodeling existing office area and creating new staff entrance renovation and expansion of portions of existing minimum security dorm to create 34-bed female maximum security dorm, classrooms, and new central control post renovation of existing indoor recreation area into 36-bed female minimum security dorm and new 12-bed dorm new corridor sitework (modifications to parking lot, storm sewer, new sidewalk, drives, etc.) B. The Owner's total budget for the Project (including all construction costs, design fees, and construction manager at risk fees, and furniture/fixtures/equipment) is $21,342,000, which is subject to adjustment in the Owner's sole discretion. C. The Owner's estimated budget for the construction costs (including hard costs, fees, general conditions, overhead and profit and CMR's contingency as well as furniture/fixtures/equipment) is $19,806,750. D. The Construction Manager and the Design Professional will assist with developing the schedule, subject to the Owner's sole discretion. E. Design Professional services are being procured separately, per the Ohio Revised Code. The Owner has selected Wachtel & McAnally Architects/Planners, Inc.
Award
Jails / Prisons
$19,806,750.00
Public - County
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 23, 2022
September 1, 2022
1960 E Gypsy Lane Rd, Bowling Green, OH
Related To This Project
Bowling Green, OH
Bid Date: Sep 01 2022
Bowling Green, OH
Bid Date: Sep 27 2022
Bowling Green, OH
Bid Date: Jan 18 2023
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Jan 18 2023
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Mar 14 2023
Bowling Green, OH
Bid Date: Mar 03 2023
Bowling Green, OH
Bid Date: Aug 09 2022
Bowling Green, OH
Bid Date: Sep 13 2022
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Aug 12 2022
Bowling Green, OH
Bid Date: Sep 01 2022
Bowling Green, OH
Bid Date: Aug 29 2022
Bowling Green, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.