BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Sacramento, California. Completed plans call for the renovation of a playground / park / athletic field; and water / sewer project.

The Work includes the construction of an underground off-line combined sewage storage facility in McKinley Park including the following: 1. Cast-in-place concrete underground storage approximately 300 feet long by 240 feet wide by 20 feet deep. 2. Cast-in place concrete underground odor control structure approximately 28 feet long by 18 feet wide by 20 feet deep. The odor control structure will house an activated carbon vessel and a blower. 3. Submersible pump station, 10 feet diameter, approximately 25 feet deep with two 15 hp. submersible pumps and discharge piping. 4. Concrete valve vault approximately 10 feet long by 8 feet wide by 8 feet deep housing 2 check valves, 2 plug valves, 2 air release valves, pressure gauges and force main piping. 5. Prefabricated public restroom with dedicated electrical and mechanical rooms. Mechanical room will house a booster pump and air break tank. 6. Yard piping including wash down water piping, foul air piping, fresh air piping, force main, water lateral connection, sewer lateral connection and site drainage piping. 7. Removal of the baseball field, backstop, associated fencing, and bleachers. 8. Removal and replacement of the picnic area landscaping, hardscaping, picnic tables and amenities 9. Tree protection and new tree planting. Landscape plantings. Irrigation system and grass replacement 10. 42 inch RCP diversion sewer, approximately 600 feet long and a 60 inch diversion sewer approximately 160 feet long. 11. Diversion structure approximately 18 feet long by 13 feet wide by 15 feet deep, with an overflow weir. 12. New electrical control equipment; yard piping; new submersible pumps; temporary bypass piping, connecting new site piping and appurtenances to existing pipelines; facility cut over; pavement restoration; recycling construction debris; removal of temporary facilities; site cleanup; and construction of all associated appurtenances as shown on the plans and/or as indicated in these Contract Documents, including all material, labor, plant, tools, equipment, and services necessary for a complete, operational facility. Online Q&A: Yes Q&A Deadline: January 18, 2019

Award

Water / Sewer

$28,000,000.00

Public - City

Renovation, Site Work

155

47

104

8

Subscribe For Documents

203 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
84
Bidding Soon
1,506
All Active Projects
556
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2019

April 15, 2019

img_map_placeholder

To Be Determined, Sacramento, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.