BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2024 at 8:00 PM

Updated October 23, 2024

Demolition, site work and new construction of a stadium in Greenwich, Connecticut. Design plans call for the construction of a stadium; for site work for a stadium; and for the demolition of a stadium.

New ice rink to be in the location of the current baseball field north of existing rink and demolition of existing rink and construction of a new baseball field in the current ice rink location, on two (2) lots totaling 13.42 acres. As of October 22, 2024, this project is in design. The architect has been identified and information regarding the method of general contractor selection is unavailable. A firm construction timeline has not been established.

Design

Arenas / Stadiums

$1,280,000.00

Public - City

Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
931
Active Projects
491
Bidding Soon
7,082
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2025

Project location map

1 Sue Merz Way, Greenwich, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.