Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 8, 2019 at 8:00 PM
Updated November 20, 2024
Site work, paving and outdoor lighting for a mixed-use development in Miami Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
As of July 18,2019 This project has not yet been awarded.A timeline for award has not yet been established. The City seeks Proposals from, construction firms to provide construction services for the construction of the Indian Creek Dr. (SR A1A) Improvements from south of 25th Street to 41st (Option A) Street and from south of 25th Street to 35th Street (Option B). Indian Creek Dr. (SR A1A) is a Florida Department of Transportation (FDOT) roadway and as such construction of this project shall comply with all applicable FDOT manuals, memorandums and guidelines in effect as of the date of the advertising of this project, including but not limited to those listed in Appendix G. The work shall include but not be limited to site preparation; clearing and grubbing; earthwork, raising the elevation of the roads within the project limits to minimum crown elevation of 3.7 feet North American Vertical Datum of 1988 (NAVD) and transitioning into crossing streets; harmonization of all adjacent properties, including but not limited to reconstructing impacted driveways and pedestrian accesses; installation of gravity walls and handrails in areas where harmonization of properties is not feasible; installation of a new drainage system, yard drains and/or driveway trench drains; complete construction of pump station including but not limited to installation of pumps, generator, control cabinets; providing new street lights; replacing existing signalized intersections with new mast arms and applicable equipment; applying new pavement markings, installing new street signs; providing new landscaping; accommodating street parking, bus stops, bus shelters, and replacing all other pedestrian features located within the existing right of way. The project warranty and testing procedures will follow the FDOT standards. In the event of a conflict between the FDOT Special Conditions and any other provision of the ITB, the FDOT Special Provisions shall take precedence and control. Estimated Budget: Option A (Improvements from south of 25th Street to 41st): $13.0 Million Option B (Improvements from south of 25th Street to 35th Street): $7.8 Million Last Day for Receipt of Questions: Date: June 18, 2019 Time: 5:00pm Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Bid Results: Option A : Ric-Man Construction Inc $13,201,900 Option B : Ric-Man Construction Inc $8,749,845
Award
Roads / Highways
$21,951,745.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2019
August 27, 2019
Indian Creek Dr & 27th St, Miami Beach, FL
Related To This Project
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Dec 02 2024
Miami Beach, FL
Bid Date: Dec 02 2024
Miami Beach, FL
Bid Date: Jan 15 2025
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Nov 19 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
