Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2019 at 8:00 PM

Updated January 26, 2024

Demolition, site work and new construction of an educational facility in Natick, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a 183,250-square-foot, four-story above grade educational facility; and for site work for a educational facility.

Construction of new 183,250 gsf., four-story, Middle School on the existing school site; estimated construction cost of $87.5 million and schedule of 35 months. The new school will be built in 2 phases. The athletic wing will be constructed after the demolition of the original building. Project includes demolition of the existing school and multi-phased site work around two existing schools on the campus. Contractor Qualification: DCAMM Certificate

Award

Educational

$77,926,000.00

Public - City

Demolition, New Construction, Site Work

1292

77

121

3

Subscribe For Documents

146 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
822
Active Projects
323
Bidding Soon
5,604
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed