BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 2, 2019 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Jordan Mines, Virginia. Completed plans call for site work for a water / sewer project.

**As of December 2, 2019, the project has not been awarded. A timeline for the award is not yet determined.** The anticipated start date is in Spring of 2020. Alleghany County has been experiencing difficulties with the existing gravity sanitary sewer system located in the Rosedale Subdivision, as well as the trunk sewer along Dunlap Creek. This system is well over five decades old and has presented the County with various challenges and maintenance issues. Therefore, this replacement project generally consists of the furnishing of all materials and construction of the sewer improvements as follows: DIVISION A - Approximately 1,485 linear feet of a new 12-inch diameter sewer pipe (and 143 linear feet of a new 8-inch diameter sewer pipe as an Add/Alternate) located along Dunlap Creek from the Red Cross facility off Midland Trail to the existing Rosedale Sewage Pump Station located near the confluence of the Jackson River. DIVISION B - Approximately 788 linear feet of new 8-inch diameter sewer pipe to serve portions of the Rosedale Subdivision, and tying into the various sewer laterals of existing homes. The scope of work includes clearing and grubbing the new sewer corridor, installing appropriate erosion & sediment control measures, installing the permanent and temporary sanitary sewer piping and manholes, performing road paving and private property restoration work, as well as other miscellaneous work as specified or indicated on the sanitary sewer construction plans. Contractor shall hold a progress meeting at a time, date and frequency set forth in the pre-construction meeting to review progress to date and resolve all questions for the upcoming progress meeting. Engineer is responsible for the preparation of the progress meeting agenda and minutes. Engineer will forward progress meeting agenda to the Contractor for any additions to agenda. DEADLINE FOR QUESTIONS: OCTOBER 15, 2019 (RECEIVED BY 4:00 P.M. LOCAL TIME)

Bid Results

Water / Sewer

$639,891.00

Public - County

Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
45
Bidding Soon
937
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2019

December 2, 2019

Project location map

Multiple Locations, Jordan Mines, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.